Queen’s Park, London.

ZedWorks undertook the technical design, fabrication and installation of this external mild steel railings, which was treated with hot-zinc spray then powdercoated finish, as part of a package of metalworks that also included the interior stair.

Architect: Studio Carver

Engineering: ODACE Engineers

Contractor: Produk Limited

Timber handrail: Crafted Handrails